Pipelines

Technical Excellence At Work

Assurance backed by competence

Pipeline pre-commissioning to maintenance services from ILI inspections to decommissioning that deliver reliability, availability, and safety to pipeline projects across multiple geographies.

At Trans Asia, we provide safe and dependable pipeline solutions for the most demanding projects. Our comprehensive range of pre-commissioning and commissioning services ensures pipelines are ready for optimal performance.

We deliver our pipeline services with advanced engineering solutions and adhere to the highest standards of safety and quality, while meeting client's timelines. Equipped to handle projects of any size we assure operational excellence coupled with environmental responsibility.

  • Pre-commissioning of pipelines

    Thorough preparation and testing to ensure new pipelines are clean and leak tested for hydrocarbon flows. The services offered include cleaning & gauging, flooding, hydrostatic testing, dewatering, drying and inert layups as required. Trans Asia also provides baseline ILI inspections as part of its services.

  • Commissioning of new pipelines

    Bringing new pipelines online and into service with safety and precision thus enabling faster startups of client’s systems.

  • Online maintenance pigging

    Integrated solutions to resolve flow issues due to sand, sludge, hydrates, or other restrictions. Routine pigging, degassing and de-oiling services to keep pipelines clean and functional.

  • Pipeline geometry and caliper survey

    Accurate measurement and assessment of pipeline geometry.

  • Inline inspection/baseline survey (MFL or UT)

    Detailed inspections to ensure pipeline integrity and safety.

  • Decommissioning of pipelines

    Systematic and safe taking of pipelines out of service.

  • Pipeline maintenance

    Ongoing maintenance to ensure the longevity and reliability of pipeline infrastructure.

Projects

  • Offshore Gas Facilities Increment Project - KSA--

    Gas Facilities Increment Project

    Location: KSA

    Services: Pipelines, Nitrogen

    Executed the pre-commissioning of over 550 km of offshore and onshore pipelines ranging from 4” to 36” in size. The project included incorporating ILI inspections, Nitrogen lay-up and Nitrogen-Helium leak testing across multiple platforms.

  • Gas Compression Pipelines Project - KSA--

    Gas Compression Pipelines Project

    Location: KSA

    Services: Pipelines, Process

    Pre-commissioned 90 pipelines totaling 800 km utilizing services like cleaning, hydro testing, and caliper surveying. Multiple spreads and SIMPOS operations ensured timely completion as per project schedule.